Critical path management
Real-time bottleneck isolation and milestone tracking. Every operation is scheduled against its dependencies, so a delay surfaces where it originates — not when the delivery is missed.
Hero
Cadence gives tier 2 and tier 3 manufacturers what their programme schedules demand: the critical path under control, sovereign traceability of every component, and penalty exposure priced before it is incurred.
Cadence // Command Center
Live
Resilience
73%
Critical lots
2/6
Exposure
€92.7K
Critical path · WP-2201
Sovereign flow
FR / EU · 69%
Sovereign core · operational
FR / EU residency
No outbound calls
Mission
Europe’s defense manufacturing relies on an overstretched, fragmented supply chain. ARX Systems builds the sovereign infrastructure designed to scale industrial resilience, ensuring no critical path fails when deterrence matters most.
Programme schedules are set by primes. They are executed by small and mid-size manufacturers whose planning lives in spreadsheets, whose delays surface too late, and whose penalties are counted in days.
ARX Systems builds the instrumentation that tier 2 and tier 3 suppliers lack: the ability to see a slippage before it becomes a breach, to price it, and to act on it — while proving where every critical component comes from.
On-premise
Reference deployment. Programme data never leaves the plant.
No database
One container, one command. Nothing to administer, nothing to migrate.
ERP-native
Reads the schedule as it leaves the system. No re-keying, no template to fill.
Platform
The production operating system for tier 2 and tier 3 defense subcontractors. Deployed on-premise, inside the workshop, with no data leaving the site.
Real-time bottleneck isolation and milestone tracking. Every operation is scheduled against its dependencies, so a delay surfaces where it originates — not when the delivery is missed.
Proactive supply chain disruption forecasting. Component origin, stock position and lead time are crossed with the active critical paths to expose the dependencies that stop production.
What-if stress testing for critical components. Inject a delay on any workstation and read the cascade instantly: revised delivery date, contractual penalty, resilience index.
Crisis scenario
Work package WP-2201 — shaft line assembly, contractual delivery 14 October, penalty clause at 0.5 % per day. Move the slider.
Critical path
Assembly to double shift · €7,200 · −4d
Readout
critical
Same arithmetic as the product. Figures recompute in 0.23 ms across the full programme.
Tech
Forward pass over the milestone graph, driving-path extraction, backward pass for float. No statistics, no black box: every date is explainable to a client.
Reads the export as it leaves the system — CSV or Excel, header blocks and total rows included. French, ISO and Excel date formats, queue times between operations preserved.
No database to administer, no outbound calls, no CDN. A single container runs inside the plant; the shared instance is French-hosted and password-protected.
Every import is kept as a timestamped, validated snapshot. Week-over-week drift is measured against stable keys, so an inserted operation is never mistaken for a general slippage.
Specifications
Every line below is verifiable in the source. Where a figure is given, it is measured — not estimated.
Contact
We walk through a live schedule, simulate a delay on one of your work packages, and quantify the exposure. Forty minutes, no slideware.